-
Shopping cart is empty
-
x
-
Shopping cart is empty
-
x
- Categories
-
Suction-pressure pneumatic conveyor T 207/2 15 kW
| Shipping within | 3 days |
| Price of consignment | The Lack Of |
| The Availability Of |
|
| The bar code | |
| EAN |
Zamów telefonicznie: +48 505 276 024
- the ability to collect grain with a suction nozzle,
- flexible configuration and routing of the transport piping system,
- the possibility of creating full transport mechanization,
- elimination of material losses.
Safety Information
Read the user manual before starting work.
Before each start-up, check the conveyor for operational safety.
The conveyor may only be operated by an adult who has familiarized themselves with this user manual.
It is forbidden to use the conveyor if it shows signs of mechanical damage.
Pay attention to hazard warnings when starting the conveyor.
Locate and read the relevant information in the user manual and warn other operators.
Each time before starting work, check that no foreign objects have entered the conveyor.
Before starting the conveyor, pay attention to its technical condition and the mounting of individual mechanisms, especially the drive system components, power supply cables, sockets and plugs, and power switches.
Before the first start-up, a qualified electrician should check the effectiveness of the grounding and the grid protection.
It is forbidden to connect power cables to the grid bypassing the socket-plug system.
Protect the conveyor's electrical installation from moisture.
After connecting the conveyor, the first start-up must be carried out in accordance with the "Trial Run" chapter.
The conveyor may only be turned on after ensuring that no bystanders are in the immediate vicinity and the power cable is connected to the grid in accordance with the applicable requirements.
The presence of bystanders, and in particular children, near the operating machine is forbidden.During machine start-up, the automatic throttle lever must be in the start position "Z".
All maintenance and repair activities must be performed after turning off the machine and removing the plug from the power socket.
Check nuts and bolts regularly for tightness and tighten them.
Any repairs to the electrical installation may only be performed by a person with appropriate qualifications.
Every time after a repair is made, check the effectiveness of the grounding.
Use appropriate tools and gloves when replacing parts.
It is forbidden to leave the conveyor unattended during operation.
In the event of an electrical installation fire, use dry powder fire extinguishers.
Do not use other types of extinguishers or water.
Due to exceeding the permissible sound level, hearing protection must be worn.
The total permissible time spent near the operating machine without hearing protection is 1 hour.
Use only original spare parts.
The manufacturer is not liable if any technical changes or repairs have been made to the machine without their knowledge, or if it has been stored, maintained, or used contrary to the user manual and recommendations.
Manufacturer details
POM Augustów
Tytoniowa 4
16-300 Augustów
Poland
+48 505 276 024
sklep@pom.com.pl